You are currently viewing FG reportedly hands over Zungeru hydropower plant to Penstock Energy
Zungerua

FG reportedly hands over Zungeru hydropower plant to Penstock Energy

  • Post author:
  • Post category:Oil & Gas

The Federal Government has reportedly handed over Zungeru hydropower plant to  Penstock Energy.

This was according to a news item scrolled by Channels Television on Tuesday. However, we are yet to confirm the story.

The  former Minister of Power, Abubakar Aliyu, had on May 2023 said that the 700 megawatts Zungeru Hydroelectric power project had been completed, and that the facility would be able to send power to the Transmission Company of Nigeria (TCN) soon.

The project is said to be  worth over $1.3 billion,  and was  constructed by CNEEC and SINOHYDRO in Niger state, Nigeria. It is said to be the second-largest hydroelectric power project in the country behind the 760 megawatts (1,020,000 hp) Kainji hydroelectric power project.